Free Construction Schedule of Values Template Excel Workbook

A progress billing schedule of values in Excel: previous and current work, stored materials, % complete, retainage, and a contract summary that calculates current payment due.

2 tabs · 40 lines12 KBNo branding — add your company name
Download Free Schedule of Values ↓
The schedule of values template filled in with a made-up example

What’s included

  • 40 billing lines: item number, description or cost code, scheduled value, work completed in previous periods and this period, and materials presently stored.
  • Calculated columns: total completed and stored, % complete, balance to finish, and retainage per line, using one retainage rate you set.
  • Contract summary: original contract sum, approved change orders, contract sum to date, total earned less retainage, previous payments, and current payment due.
  • Built-in checks: flags any line billed over 100%, any amount with no scheduled value, and an SOV total that doesn’t match the contract sum.
  • Application details: application number, period-to date and contract or PO number.
  • Start Here tab: step-by-step instructions, a color key, and notes on stored materials and moving to the next period.

How to use this template

  1. Type your company and project name, and fill in the application number, period and contract number.
  2. Set your retainage rate (the sample is 10%) to match your contract.
  3. Replace the three sample lines with your approved schedule of values, and add approved change orders as their own lines.
  4. Each period, enter work completed this period, plus stored materials if your contract allows billing for them.
  5. Fix anything flagged in red, then check the contract summary and current payment due.
  6. Before the next period, roll this period into “previous periods,” or save a copy for each application.

Template preview

Shown filled in with a made-up example, so you can see what a finished one looks like. The download is blank and ready for your logo. Tap to enlarge. Open the filled-in example (PDF) →

The schedule of values template filled in with a made-up exampleThe blank schedule of values sheet, ready to fill in

Get your free template

Enter your email and the download starts right away. No account, no password.

You’ll get the download right away. We only email you updates if you check the box. Privacy

Excel tool · $67

Contractor Profit Tracker

An Excel system for one commercial construction project. Tracks change orders, extra work, costs, billing and cash. Every Monday it tells you who to call and where your money is.